HOME | REQUEST CATALOG | CONTACT | VIEW CART
HQ
(800) 877-8889
 
International Customers
 


Design Center > Step-By-Step Projects

 

Perfect Double-Bubbles
Using Conwin's Double Bubble Outlet
and Dual Split-Second Sizer

 
   

Press-fit the Double Bubble Outlet onto the inflating outlets of the Dual Split-Second Sizer. Attach the yellow hose to the right outlet and the blue hose to the left outlet.

   

 

 
   

Set the Dual Split-Second Sizer to MODE 3 on the control panel, and set the Second Stage Regulator to 60psi. Set the unit to properly inflate the balloons by referencing the following chart:

  Outside Balloon: 16"   
Right outlet, yellow hose,
Dual Sizer Setting: 3.2 Seconds
  Inside Balloon: 11"   
Left outlet, blue hose,
Dual Sizer Setting: 1.7 Seconds

 

   

 

 
   

Place the 11" balloon over the blue hose.

   

 

 
   

Place the 16" balloon over the 11" balloon and the yellow hose. Hold firmly to prevent helium from escaping during the inflation process.

   

 

 
   

Tap the foot pedal to inflate the balloons. After the balloons are fully inflated, pinch the neck of the balloons together and remove the Double Bubble outlet quickly to prevent helium from escaping.

   

 

 
   

Pull the neck of the inside 11” balloon while pinching the necks of the 2 balloons together.

 
 
 
    Stretch the neck of the inside 11” balloon around the neck of the outside 16” balloon.
 
 
 
    Tie off the balloon.
 

stepTheme instructionsTheme


   Conwin Distributor Network    International Support    Service & Repair Center   
View Catalog    Contact Us

Copyright © 2011 Conwin Carbonic Co., Inc. All rights reserved . View Pricing and Returns Policy.